Case studies / volta

Volta — outage triage fleet

Client — Volta EnergySector — EnergyDuration — 8 weeksTeam — 2 engineers
−48%
triage time
8 weeks0.6% escalatedgrid-wide coverage
Problem

Field alarms arrived faster than the on-call team could triage them, and dispatch orders were drafted from memory rather than the underlying grid telemetry.

Intervention

An agent fleet that correlates incoming alarms against grid topology, drafts a ranked dispatch order, and routes anything outside its confidence band to a human reviewer.

Outcome

Triage time fell 48% with 0.6% of decisions escalated to a human — and every draft order carries the telemetry that produced it.

dispatch queue depth — 30s window
−48%triage time
0.6%escalated to a human
8 wksengagement length
planner topology
throughput / depot
8 wks
engagement length

"The eval suite alone paid for the engagement — we catch regressions before they ship now."

VEVolta EnergyCo-founder
Share this case study
← Previous case
Cadence — ledger rewrite
Next case →
Aster — intake summariser
Q4 2026 — two slots

Let's Build the Thing You've Been Putting Off.

15 minutes with the engineer who'd actually build it. If we're not the right fit, we'll tell you straight and point you somewhere better if we can.

No sales pitchNDA on requestReply in 1 business day